What is reverse circulation rotary method?

1. When the drill pipe is lengthened, a rubber ring with a thickness of 3-5mm should be padded between the flange joints, and the bolts should be tightened to prevent air and water leakage. The drill bit should be inserted about 20-30cm from the bottom of the hole, and the drilling should be started slowly when the drilling rig is started.

2. When drilling in hard soil, use first gear speed and free footage; when drilling in high liquid limit clay and low liquid limit clay with sand, use second and third gear speed and free footage; when drilling in sandy soil or containing a small amount of pebble, first and second speed should be used and footage should be controlled; after entering rock stratum, weight should be increased according to geological conditions to enhance the stability and drilling strength of the bit Degree.

I want to correct it 】Editor in charge: constructor
Collection and sharing: forum
Share with:
Related news
  • Special class
    4 classes + 2-3 sets of real simulation questions
    Improve learning effect
  • Excellent class
    4 classes + 2-3 sets of real simulation questions + 1 set of prediction questions
  • Experimental class
    Three sets of real simulation questions + two sets of prediction questions + a collection of pre examination examination examination books
  • Customized class
    3 sets of simulation questions + 3 sets of prediction questions + pre examination key points
  • Mobile class
    Take knowledge points as unit teaching exercises,
    Strengthen the key points, difficulties and test points
Copyright notice

1. The copyright of all works marked "source: Construction Engineering Education Network" in this website belongs to the construction engineering education network. Without the authorization of this website, it is not allowed to reprint, link, paste or use in other ways; those that have been authorized by this website should be used within the scope of authorization, and must be marked with "source: Construction Engineering Education Network". Those who violate the law will be investigated.
2. Some of the materials on this website are collected and reproduced on the Internet, and the author and source should be indicated as far as possible. For the works published on this website involving copyright and other issues, please contact our website, which will be dealt with as soon as possible after verification and confirmation.
The works reproduced on this website do not mean that they agree with the views or authenticity of the works. If other media, websites or individuals reprint and use, please contact the copyright owner and bear the legal responsibility.
3. Contributions to this website are welcome.